01
Plan against the hours you have
Schedule by machine and department, with labor capacity in view, so the dates you promise come from what the shop can actually do.
Job shop scheduling
High-mix, low-volume shops do not run to a tidy plan. Tangle shows the load on every machine and department against its available hours, flags the conflicts when the day changes, and suggests the next open slot, so you decide what moves with the full picture in front of you.
01
Schedule by machine and department, with labor capacity in view, so the dates you promise come from what the shop can actually do.
02
Drag a job and watch the load on every machine update before you commit.
03
Milo, Tangle's built-in AI engineer, can shape the scheduling views and rules around how your shop runs. You describe the change, preview it in a sandbox, and it is applied once someone on your team approves it.
04
The schedule runs on the same jobs and work orders as your quoting, inventory and purchasing, so there is no separate tool to keep in step.
Most scheduling tools assume repeatable runs and stable demand. A job shop has neither. Every job is a little different, rush work lands mid-week, a machine goes down, and the plan you built on Monday is wrong by Tuesday morning.
Not every work center needs the same treatment, either. Our guide, Which scheduler does your shop need?, makes the case that most shops do best scheduling tightly at the bottleneck and planning everywhere else on lead times. If you are weighing the two approaches, infinite vs finite scheduling covers the trade-off in plain terms.
Tangle shows the load on each machine and department against its hours, as a visual board you can group by project, department or stage, in day, week or month views. Overloads and conflicts are flagged, so you can schedule tightly where the shop is actually constrained.
"Tangle is able to bend every which way and that's been the best aspect of working with this software."
The Schedule Assistant is the part most shops notice first. It reads the schedule and tells you where the trouble is, in plain language. Nobody has to stare at a Gantt chart to find it.
Shops schedule differently, and the way you schedule changes over time. With Milo, Tangle's built-in AI engineer, you describe how you want the scheduling views and rules to work for your shop. Milo builds the change in a sandbox, you preview it, and it is applied once someone on your team approves it. Every request is tracked on a board, so you can see what was asked for and what went live.
Scheduling in Tangle is part of the same ERP as your quoting, work orders, inventory and purchasing. The schedule runs on the same jobs and work orders as the rest of the shop; there is no separate scheduling tool to reconcile, and nobody types the same job in twice. If your shop runs mixed job work or fabrication, see job shop ERP and metal fabrication ERP.
Our prices are on our website, by user type, so you can work out what Tangle would cost your shop before you talk to anyone. The core migration and setup work needed to get live is normally included in that price, with no separate services bill for the basics, and we support running your old system in parallel until you are ready to switch.
For a high-mix shop, the right tool shows real load against the hours you have, flags conflicts when the day changes, and stays connected to your jobs and work orders. Tangle does that inside a full ERP, so scheduling, quoting, inventory and purchasing work from the same records.
Tangle shows load against capacity for every machine and department and flags conflicts. Most shops do best scheduling tightly at the bottleneck and on lead times everywhere else, and Tangle lets you work that way.
It suggests rather than decides. When something changes, Tangle flags the conflicts and suggests the next open slot, and you decide what moves. The Schedule Assistant also points out late and at-risk work, so you see the knock-on before it reaches the floor.
Yes. You describe what you want to Milo, Tangle's built-in AI engineer, and it can shape the scheduling views and rules around how your shop runs. The change is built in a sandbox, previewed, and applied once someone on your team approves it.
Yes. The Schedule Assistant writes a foreman shift brief from the day's schedule, along with the bottlenecks, late work and dependency conflicts it has found.
No. Scheduling is part of Tangle ERP and runs on the same jobs and work orders as your quoting, inventory and purchasing.
Get started
Bring a week of work that gave you trouble. In 30 minutes we will show you the scheduler on work like yours, including what the Schedule Assistant would have flagged.
Not ready for a demo? Start a guided trial instead. We set it up around your own workflows rather than handing you an empty system, and we will be in touch within 24 hours.
Free trial
Enter your email below and someone from our team will be in touch shortly to get you set up.